Introduction

This guide provides detailed instructions for installing a closet organizer, ensuring a well-structured and efficient setup. By following the steps outlined in this document, you can successfully install your closet organizer and maximize your storage space.

Step-by-Step Instructions

Find Your Layout

Begin by locating your layout in the installation booklet. The double hang is created with two four-foot shelves, while the long hang is achieved by cutting the six-foot shelf to 21 and 3/4 inches. Adjust your cut based on the actual length required.
Find Your Layout

Mark Shelf Locations

Next, locate the three initial weight locations for your configuration. Measure up from the floor and mark the shelf locations. Draw a six-foot level line out from the wall-end at the 84-inch location, followed by a four-foot level line out from the wall-end at the 42-inch location.
Mark Shelf Locations

Draw Additional Level Lines

Draw a 22-inch level line out from the wall-end at the 72-inch location. Mark the stud locations at the level lines.
Draw Additional Level Lines

Prepare the Tower

Place the tower side down with the grooves facing up. Secure a cam bolt to the tower side at the designated hole location. Repeat this process for the other location and for the second tower side.
Prepare the Tower

Insert and Secure the Tower Components

Insert the tower side into the tower bottom. Next, insert a cam nut into the tower bottom with the arrow facing the bolt and tighten it by turning clockwise. Repeat this for all locations.
Insert and Secure the Tower Components

Attach the Tower Top

Place the tower top into the notches at the top of the tower. Insert a barrel nut into the tower side and a barrel bolt into the tower top. Tighten with the provided Allen wrench. Adjust the barrel nut as necessary.
Attach the Tower Top

Install the Tower Brackets

Lay the tower face down and place the top tower bracket between the first and second groove. Then, place the middle tower bracket between the eighth and ninth grooves, followed by the bottom tower bracket between the last groove and the bottom. Secure them to the tower side using number eight three-quarter inch screws.
Install the Tower Brackets

Wall Stud Installation

It is recommended to install the hardware into wall studs, which are typically 16 inches on center. If no stud is present, use a 50-pound wall anchor.
Wall Stud Installation

Mount Shelf Hardware

On the top level line, use three of the shelf mounting hardware within the 48-inch shelf space. Also, use two of the shelf mounting hardware within the 24-inch tower top space. Ensure that one of the shelf mounting hardware is installed into a wall stud at the tower top location.
Mount Shelf Hardware

Mark and Secure Shelf Mounting Locations

Center the top hole of the shelf mounting hardware with the level line and mark the hole locations. Use wall anchors if no stud is present and secure to the wall with number 8 1 1/2 inch screws. Repeat this process for all remaining locations.
Mark and Secure Shelf Mounting Locations

Attach Shelf End Template

Place the shelf end template onto the side wall, aligning the template line with the wall line and leveling it. Mark the required shelf end position for the desired depth, either 12 or 16 inches, and secure using number 8 1 1/2 inch screws.
Attach Shelf End Template

Finalize the Installation

Finally, place the shelf onto the hardware, followed by the tower onto the hardware. Use a level on the shelf to ensure everything is aligned correctly.
Finalize the Installation

Conclusion

By following the steps outlined in this guide, you can successfully install your closet organizer. The combination of detailed instructions and visual aids will help ensure that you create an organized and functional space in your home. Enjoy your newly organized closet!